Back to Daycare
CDSA Launch at Beacon Hill
2025 14th Ave S, Seattle, WA 98144, USA
Inspection
Term Risk Level
Inspection Details
Observation
0106(10) - Staff KW and LW need to acquire BBP training. Some staff need to renew BBP training. (annually) 0106(11) - Some staff are missing CPR/FA training. (YC, IL, CN, KW, LW) 0106(12) - KW, LW need CPR/FA training and/or update Merit. 0106(3) - KW, LW need CCB training.
Risk Level
Term
Code
110-300-0106(3)
Inspection Date
Oct 15, 2024
Inspection Method
Physical
Inspection Type
Monitoring
Correction Date
Correction Verified Date
Disputed
Date Disputed
Official Document
View Inspection ReportNearby Child Cares
The Family Success Childcare Center
Child Care Center
2 years 6 months - 6 years 0 months
Yesler Terrace
View Details
A 4 Apple Learning Center (Today's Central)
School-age Program
5 years 0 months - 13 years 0 months
Central District
View Details